We successfully completed the second floor of the building, delivering the project to specification and in line with all relevant fire and safety requirements. Through careful planning and close coordination with the client team, we ensured high standards of workmanship and compliance throughout.
In addition, all timber fire doors were installed under our BM Trada scheme, with full photographic records and certification information captured to ensure traceability and quality assurance.
Key features of the project included:
• 30-minute and 60-minute fire-rated drywall partitions
• Fire-rated glazed screens
• SAS 130 Trugrid ceilings
• FD30 and FD60 timber fire doors
• BM Trada-certified installations
• Complete ironmongery installation
This project reflects our commitment to delivering high-quality, fully compliant solutions in technically demanding environments.
Talk to us. We’re happy to help you with your design and specification.
Call us on 01268 695222 or email us at info@urban-group.uk